Wellshill was appointed contractor of choice following an initial phase of ECI to undertake the ground and infrastructure works for Agrivert. The proposed AD facility would process approximately 48,500 tonnes of biodegradable organic waste (the majority of which would be comprised of food waste) per annum and would generate 2.4MW of renewable energy per annum.


Utilising our in-house plant and labour, Wellshill excavated, crushed and screened all excavated material.

Our multi-skilled workforce undertook the works to install all required drainage, ducting and finishing works for the site.


The project was deemed a success with Wellshill demonstrating its experience in delivering multi-disciplined projects.

Wellshill was appointed contractor of choice following an initial phase of ECI to undertake the ground and infrastructure works for Agrivert. The proposed AD facility would process approximately 48,500 tonnes of biodegradable organic waste (the majority of which would be comprised of food waste) per annum and would generate 2.4MW of renewable energy per annum.


Utilising our in-house plant and labour, Wellshill excavated, crushed and screened all excavated material.

Our multi-skilled workforce undertook the works to install all required drainage, ducting and finishing works for the site.


The project was deemed a success with Wellshill demonstrating its experience in delivering multi-disciplined projects.