Larport 132 kV Grid Connection Compound

Larport 132 kV Grid Connection Compound

  • 132 kV solar farm substation compounds,

  • Site preparation and site clearance,

  • Compound creation,

  • Reinforced concrete bases,

  • Reinforced concrete transformer bunds beneath ground level,

  • Control room kiosks, including basement substructures and brick-built superstructures,

  • Raised/above ground concrete plinths and bases,

  • Several KM of electrical ducting underground between the two projects,

  • Ring beam security fencing preparation,

  • Drainage including attenuation tanks.

  • 132 kV solar farm substation compounds,

  • Site preparation and site clearance,

  • Compound creation,

  • Reinforced concrete bases,

  • Reinforced concrete transformer bunds beneath ground level,

  • Control room kiosks, including basement substructures and brick-built superstructures,

  • Raised/above ground concrete plinths and bases,

  • Several KM of electrical ducting underground between the two projects,

  • Ring beam security fencing preparation,

  • Drainage including attenuation tanks.